Division 2

Site Construction

Division 2 represents Existing Conditions and captures site assessments and investigations, structures demolitions, and remediation of contaminated soil, buildings, and groundwater.  

This Division also covers approaches to identify site features that could impact project follow-up work. While many conditions of the site aren’t immediately obvious, Division 2 speaks to the requirement of identifying pre-construction tasks so they’re better defined. Lastly, this division includes methods to lessen undesirable site and building attributes, which might include groundwater remediation and removing mold and asbestos.

Coleman Materials supplies materials for Geotextiles, Paving Reinforcing / Dowel Baskets, Drainage, Preformed Trench Drains. Contact us about your project.

Click on the manufacturer’s logo for detailed information and specifications on your site construction product choice.

0/5 (0 Reviews)
Hubbell Power Systems Inc Logo
Josam Logo
Zurn Logo
Hancor Logo
Dayton Superior Logo
MeadowBurke Logo
Carthage Mills Logo
Tencate Materials Logo